Before installation, your system is designed, approved by Solrite, and permitted by your city.
Good to know: In some markets, Solrite assigns a local installation partner to handle your survey and installation. If that's the case for your project, we'll let you know who they are — and rest assured, Solrite stays with you the whole way, reviewing every step and making sure the work meets our standards.
Site survey and design
Your installer visits to measure your roof, check your attic and electrical panel, and photograph everything. They use this to design a system that fits your roof and your energy use.
Your part: Make sure the installer can reach your roof, attic, main electrical panel, and the spot where your battery will go.
Solrite design review and Notice to Proceed
Solrite engineers review the design for safety and performance. When everything checks out, we issue a Notice to Proceed (NTP) — the green light for your installer to schedule installation. If we need changes, we work directly with your installer; you don't need to do anything.
Building permits
Your installer applies for permits with your city or county. Approval can take days or several weeks depending on the local office.
HOA approval
If you have a homeowners association, check whether it requires approval for solar. Your installer can usually provide the plans your HOA needs. Many states limit how much an HOA can restrict solar, but approval steps still apply.
Good to know: A design change late in the process — for example, moving panels to a different roof face — can mean a new permit and a few more weeks. If you have preferences, share them early.