Solar has its own vocabulary. Here's what the words mean for you.
| Term | What it means |
|---|---|
| AHJ | "Authority Having Jurisdiction" — the city or county office that issues your building permit and inspects your system. |
| Battery reserve (buffer) | The portion of your battery always held back for your home during an outage. It can't be used by the VPP. |
| Buyout | Purchasing the solar system from Solrite. Available starting in year 6 of your agreement. Batteries stay Solrite-owned. |
| Escalator | A fixed annual percentage increase in your monthly payment, if your agreement includes one. It's written in your agreement. |
| Essential loads (protected loads) | The circuits in your home connected to your battery for backup — usually lights, refrigerator, and key outlets. |
| Essential Load Panel | The electrical panel that holds your backed-up circuits. |
| Grid | The utility's network of power lines that delivers electricity to your home. |
| Halo / Eclipse light | The ring of light on a sonnen battery that shows its status. Duracell systems use a display screen instead. See What your battery's status lights and screen mean. |
| Inverter display | The screen on a Duracell Max Hybrid inverter that shows the system's status. |
| In Service | The day your system is officially active and Solrite takes over as your main contact. Billing starts 30 days later. |
| Installation partner (IP) | The local company that sold and installed your system on Solrite's behalf. |
| Interconnection agreement | A document from your utility that allows your system to connect to the grid. Your utility may ask you to sign it. |
| kW / kWh | kW is power (how fast energy flows); kWh is energy (how much is used or produced over time). Your bill and production are measured in kWh. |
| Non-essential load panel | On sonnen systems, circuits that are not backed up by the battery. They turn off during a grid outage. |
| Whole-home backup | Most Duracell Power Center systems, and some sonnen systems, keep nearly every circuit connected during an outage. The battery still has a power limit and limited stored energy, so heavy appliances should stay off. |
| NTP (Notice to Proceed) | Solrite's approval for your installer to begin installation. |
| PPA (Power Purchase Agreement) | Your agreement with Solrite: we own, install, insure, and maintain the system; you pay a monthly amount for the energy and services. |
| PTO (Permission to Operate) | Your utility's approval to turn on your system. |
| REP (Retail Electric Provider) | In Texas, the company that sells you grid electricity. |
| Upgrid | Solrite's enrollment partner in Texas. Upgrid emails you a link to enroll with a Solrite REP Partner after Permission to Operate. |
| Solrite REP Partner | A Texas electricity provider approved by Solrite, with plans built for solar and battery homes. See Texas: enrolling with your Solrite REP Partner. |
| Self-consumption | Using your own solar and stored battery energy first, before drawing from the grid. |
| Storm Mode | A feature that charges your battery ahead of severe weather. See Storm Mode: how your battery gets ready for severe weather. |
| True-Up | Solrite's performance guarantee review. If your solar system produces less than guaranteed over 24 months, you receive a credit. See Your performance guarantee (True-Up). |
| VPA | Short for your Solrite agreement. Billing emails refer to your VPA monthly payment. |
| UCC-1 | A public filing that records Solrite's ownership of the equipment on your roof. It is not a lien on your home. See I got a letter about a "UCC" filing. What is it?. |
| Battery-only system | A Solrite battery installed without Solrite solar panels. It charges from the grid. See Battery-only systems: how your battery works without solar. |
| Battery VPA | The agreement for a battery-only system. |
| VPP (Virtual Power Plant) | A network of home batteries working together to support the grid. See What is a Virtual Power Plant — and how does Solrite's work?. |
| VPP event | A period when your battery shares stored energy with the grid. |